Estimating process capability
Plot a process capability histogram and compute indices to determine if a process can meet specifications.
This task creates a new process capability analysis report. You can also estimate
the process capability directly from a process control analysis report using the
Capability command in the Process
Capability group on the Analyse-it ribbon
tab.
- Select a cell in the dataset.
-
On the Analyse-it ribbon tab, in the
Statistical Analyses group, click Capability, and then click:
Option Description 3-up Compute capability ratios and plot a histogram and univariate plot. 4-up Compute capability ratios and plot a histogram, univariate plot, and normal probability plot. 6-up Compute capability ratios and plot a histogram, univariate plot, normal probability plot and control charts. The analysis task pane opens. -
In the Model drop-down menu:
- If the data are individual observations, select Process variable .
- If the data are rational subgroups, select Process variable with Subgroups.
- In the Process drop-down list, select the quality characteristic variable.
-
If the data are collected in subgroups, in the Sample size group:
- If the subgroups are identified by a variable, select Subgroup by identifier variable, and in the Id drop-down list, select the subgroup identifier variable.
- If the subgroups are a constant size and formed by consecutive number of observations of the process variable, Subgroup size constant, and in the edit box, enter the number of consecutive observations per subgroup.
- Optional: If the data are individual observations, in the Id drop-down list, select an identifier variable
- In either or both the LSL and USL edit boxes, type the lower and upper specification limits.
- Optional: In the Target edit box, type the target value.
- Optional:
If you are using control charts, in the Sigma estimator drop-down list, select:
Option Description Long-term Use the overall standard deviation of the individual measurements. Short-term Use the within-subgroup sigma of the process (using the process control R-, S-, or MR- chart). - Select the Capability ratios, Z benchmark, or Nonconforming units check boxes.
- Click Calculate.
Related tasks
Related reference